<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>SurveyEra — Maritime surveying knowledge</title><description>Independent maritime surveying knowledge platform. Practical, source-verified guidance on draft survey, bunker survey, cargo inspection, sampling and marine claims.</description><link>https://surveyera.com/</link><language>en-gb</language><copyright>© 2026 SurveyEra</copyright><item><title>Hatch Cover Weathertightness: Pre-Loading Inspection Checklist</title><link>https://surveyera.com/cargo-survey/hatch-cover-weathertightness-checklist/</link><guid isPermaLink="true">https://surveyera.com/cargo-survey/hatch-cover-weathertightness-checklist/</guid><description>Before loading, hatch covers are inspected for the condition of the packing and its channel, correct compression, the condition of cross-joint seals and wedges, the state of the coaming and compression bar, and clear drain channels with working non-return valves. Most wet damage claims trace to compression and drainage rather than to a visibly torn seal.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Cargo Survey</category><category>Surveyor Checklist</category><author>SurveyEra Editorial</author></item><item><title>What Is TPC in a Draft Survey?</title><link>https://surveyera.com/draft-survey/what-is-tpc/</link><guid isPermaLink="true">https://surveyera.com/draft-survey/what-is-tpc/</guid><description>TPC — tonnes per centimetre immersion — is the weight that must be added or removed to change a vessel&apos;s mean draft by one centimetre at a given draft. It comes from the waterplane area and the water density, and in a draft survey it converts a difference in draft into a difference in weight.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Draft Survey</category><category>Knowledge Note</category><author>SurveyEra Editorial</author></item><item><title>Trim Correction in a Draft Survey: First, Second and the Sign Errors</title><link>https://surveyera.com/draft-survey/trim-correction-explained/</link><guid isPermaLink="true">https://surveyera.com/draft-survey/trim-correction-explained/</guid><description>Trim corrections adjust the displacement read from the hydrostatic tables for the fact that a trimmed vessel does not float at the draft the tables assume. The first correction allows for the LCF not being at amidships; the second allows for the change in waterplane shape as the vessel trims. Both are applied to displacement before any deductibles.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Draft Survey</category><category>Explainer</category><author>SurveyEra Editorial</author></item><item><title>How to Perform a Draft Survey: The Full Procedure</title><link>https://surveyera.com/draft-survey/how-to-perform-a-draft-survey/</link><guid isPermaLink="true">https://surveyera.com/draft-survey/how-to-perform-a-draft-survey/</guid><description>A draft survey determines cargo quantity by measuring the vessel&apos;s displacement before and after cargo work. Six drafts are read and corrected to the perpendiculars, a quarter mean allows for hull deflection, displacement is taken from the hydrostatic tables and corrected for trim and water density, non-cargo weights are deducted, and the difference between the two net displacements is the cargo.</description><pubDate>Mon, 14 Sep 2026 00:00:00 GMT</pubDate><category>Draft Survey</category><category>Technical Guide</category><author>SurveyEra Editorial</author></item></channel></rss>